Cybernetic Heart
The Cybernetic Heart beats with a fusion of technology and emotion, a mechanized core pulsing with unstoppable energy. This futuristic Valentine’s miner symbolizes the perfect balance between power and passion, driving your mining operations with the precision of a machine and the intensity of a real heartbeat. Let the Cybernetic Heart power your journey with unbreakable strength and unwavering rhythm!
ID
129
Rarity
Epic
Width
1
Fragmentable
No
Power Base
46.600 GH/s
Collection
Valentine
Merge level 1 to 2
Requirements for Merging
Total Base Resources (L1)
Investment for this Level
Power Upgrade
Total Accumulated Cost
Includes all previous levels and base parts.
Power/Cost Ratio:
The higher the ratio, the greater the profitability (it does not take into account the cost of purchasing the miners).
Merge level 2 to 3
Requirements for Merging
Total Base Resources (L1)
Investment for this Level
Power Upgrade
Total Accumulated Cost
Includes all previous levels and base parts.
Power/Cost Ratio:
The higher the ratio, the greater the profitability (it does not take into account the cost of purchasing the miners).
Merge level 3 to 4
Requirements for Merging
Total Base Resources (L1)
Investment for this Level
Power Upgrade
Total Accumulated Cost
Includes all previous levels and base parts.
Power/Cost Ratio:
The higher the ratio, the greater the profitability (it does not take into account the cost of purchasing the miners).
Merge level 4 to 5
Requirements for Merging
Total Base Resources (L1)
Investment for this Level
Power Upgrade
Total Accumulated Cost
Includes all previous levels and base parts.
Power/Cost Ratio:
The higher the ratio, the greater the profitability (it does not take into account the cost of purchasing the miners).
Merge level 5 to 6
Requirements for Merging
Total Base Resources (L1)
Investment for this Level
Power Upgrade
Total Accumulated Cost
Includes all previous levels and base parts.
Power/Cost Ratio:
The higher the ratio, the greater the profitability (it does not take into account the cost of purchasing the miners).